KPI & System Summary

––
Total Energy
418 kWh
17.4 kWh/h
vs Baseline 442 kWh base
Power Demand
530 kW
Peak 545 kW
vs Baseline 570 kW base
Electricity Utilization Index (EUI)
0.62 kWh/m²
GFA 42.5k m²
vs Baseline 0.68 target
PV Solar Gen
148 kWh
Peak 38.5 kW PR 84.1%
vs Baseline 138 exp
Carbon Emission
0.17 tCO₂e
-62 kg PV Scope 2
vs Baseline 0.20 cap
Energy Mix
35.4 %
Solar
64.6 %
Grid
148 kWh Clean 270 kWh Grid
vs Baseline 31.2% target
Total Water
7.2 m³
WUI 0.011 m³/m² 300 L/h avg
vs Baseline 8.0 m³ base
Water Utilization Index (WUI)
0.17 m³/m²
GFA 42.5k m²
vs Baseline 0.19 target

Chiller Plant Intensity & Benchmarks

Cooling, Electrical & Efficiency Telemetry
Electrical Load
≤ 950 kW
Cooling Load
1,420 RT (39%)
Plant Efficiency
Target ≤ 0.600
Electrical (kW) Cooling (RT) Efficiency (kW/RT) Efficiency target (≤ 0.600)
–

Building Utility Intensity & Telemetry

Electricity (kW, EUI) & Water (m³, WUI)
Electricity
Target ≤ 0.68 EUI
Electrical Usage
530 kW
EUI (Target ≤ 0.68)
0.62 kWh/m²
Water Consumption
Target ≤ 0.19 WUI
Water Usage
7.2 m³
WUI (Target ≤ 0.19)
0.17 m³/m²
Electricity (kW) Water Flow (L/h) EUI Target (≤ 0.68) WUI Target (≤ 0.19)

Alarm Summary & Priority Distribution

Active, Acknowledged & Criticality Classification (P1, P2, P3)
Live
8
Active
Requires Dispatch
19
Acknowledged

MMS Work Orders

Maintenance System • Live Status & Priority
Live
WORK ORDER TYPE 56 Total Orders
Preventive
38 68%
Corrective
18 32%
LIFECYCLE STATUS PIPELINE Active Cycle
Open
6 11%
In Progress
12 21%
Closed
38 68%
WORK ORDER PRIORITY Criticality
P1 Critical
3 5%
P2 High
9 16%
P3 Routine
44 79%

Upcoming Work Orders

Next 5 Scheduled Dispatches • Live Timeline
Live
16 OCT 09:00 In 15h
WO-8820 Chiller CH-02 PPM P1 Critical
Semi-Annual Thermodynamic Efficiency Overhaul & Tube Eddy Current Testing
A. Wong Scheduled
16 OCT 14:30 In 21h
WO-8824 Condenser Pump CDP-03 CM P2 High
Mechanical Seal Overhaul & Dynamic Laser Shaft Realignment
S. Jenkins Pre-check
17 OCT 10:00 1d 17h
WO-8829 Cooling Tower CT-01 PPM P2 High
Variable Frequency Drive Fan Belt Inspection & Spray Nozzle Flush
D. Tan Parts Ready
18 OCT 11:15 2d 18h
WO-8835 Air Handling Unit AHU-04 PPM P3 Routine
Primary MERV-13 Filter Differential Pressure Sensor Calibration
K. Lee Assigned
19 OCT 15:00 3d 22h
WO-8842 Flow Meter FM-01 PPM P3 Routine
Ultrasonic Transit-Time Meter Re-zeroing & Signal Diagnostics
R. Chen Queued